Percent overshoot = 100·exp(−πζ/√(1−ζ²)). It depends only on the damping ratio ζ of a standard underdamped second-order system; ζ = 0.5 gives 16.3 %.
Mp = 100 exp[−πζ/√(1−ζ²)]
Enter your values
Units shown per inputEnter values and select Calculate.
Work through the default case
The example uses these inputs. Replace them with your own values only after checking the model assumptions.
| Input | Value | Unit |
|---|---|---|
| Damping ratio | 0.5 | dimensionless |
- Percentage overshoot
- 16.30335 %
These values show the equation in use. They are not recommended operating conditions or material specifications.
The formula and its symbols
For the standard underdamped second-order system with unit-step input, the peak percentage overshoot is
Mp = 100 exp[−πζ / √(1 − ζ²)]
- ζ: damping ratio, dimensionless, valid for 0 < ζ < 1.
- Mp: overshoot as a percentage of the final value.
- ωn: undamped natural frequency in rad/s. It does not appear in the formula, so the natural frequency changes how fast the response moves but not how far it overshoots.
- σ = ζωn, in 1/s, and ωd = ωn√(1 − ζ²), in rad/s: the real and imaginary parts of the pole pair.
The result comes from evaluating the step response at its first peak, tp = π/ωd. Course notes from the University of Illinois (ECE 486) derive it this way and describe the formula as exact. At ζ = 0 the response never decays, and at ζ ≥ 1 there is no overshoot, which is why the calculator accepts only 0.0001 to 0.9999.
Assumptions, and where the model breaks down
- The transfer function is exactly ωn²/(s² + 2ζωn s + ωn²) with unity DC gain and a step input.
- There are no extra poles, no zeros and no time delay. A closed loop with a zero near the dominant poles, a third pole or a transport delay can overshoot by a very different amount even when its dominant pair has the same ζ.
- The system is linear. Actuator saturation and rate limits change the response and are not captured.
When the model does not fit, read the overshoot from a simulation or a measured step response instead.
Overshoot, peak time and settling time for ζ = 0.5
With ζ = 0.5: √(1 − 0.25) = 0.8660, πζ/√(1 − ζ²) = 1.8138 and exp(−1.8138) = 0.1630. The overshoot is 16.3 %, which is the calculator's default.
Now take ωn = 10 rad/s. Then σ = 5 1/s and ωd = 8.660 rad/s, so the peak occurs at tp = π/ωd = 0.363 s. The Illinois notes estimate the 5 % settling time as 3/σ = 0.60 s. The King Fahd University (KFUPM) notes give the 2 % criterion as about four time constants, 4/σ = 0.80 s.
To find the damping ratio for a target overshoot, rearrange the formula. For 10 % overshoot, ζ = −ln(0.10) / √(π² + ln²(0.10)) = 2.3026 / 3.8950 = 0.591.
How to read the result
Overshoot falls quickly as damping rises:
| ζ | Overshoot |
|---|---|
| 0.2 | 52.7 % |
| 0.5 | 16.3 % |
| 0.7 | 4.6 % |
| 0.9 | 0.15 % |
Low damping gives a fast response with large overshoot. Higher damping removes the overshoot but slows the rise, so the choice of ζ is a trade between the two.
Common mistakes
- Entering a percentage. ζ is a ratio, not a percentage. 0.5 means 50 % of critical damping.
- Mixing settling-time conventions. The Illinois notes use a 5 % band and 3/σ, while MATLAB's
stepinfodefaults to 2 %, about 4/σ. The overshoot itself does not depend on the band. - Applying the formula to higher-order systems without checking that one pole pair dominates and that no zero sits nearby.
- Confusing ωn and ωd. The peak time uses the damped frequency ωd, not ωn.
Frequently asked questions
What is the percent overshoot formula?
Mp = 100 exp[−πζ/√(1 − ζ²)], where ζ is the damping ratio of a standard underdamped second-order system with 0 < ζ < 1.
What damping ratio gives 10 % overshoot?
About 0.59. Rearranging the formula gives ζ = −ln(Mp/100) / √(π² + ln²(Mp/100)).
Does natural frequency change the overshoot?
No. The formula contains only ζ. A higher ωn makes the same shape happen faster.
Is there overshoot when ζ is 1 or more?
Not in the standard second-order step response. Critically damped and overdamped responses approach the final value without crossing it.
Is a 2 % or 5 % band used for overshoot?
Neither. Those bands define settling time. Overshoot is the height of the first peak above the final value.