Controls & electrical · calculator

Second-Order Step Overshoot

Percent overshoot = 100·exp(−πζ/√(1−ζ²)). It depends only on the damping ratio ζ of a standard underdamped second-order system; ζ = 0.5 gives 16.3 %.

The model

Mp = 100 exp[−πζ/√(1−ζ²)]

Enter your values

Units shown per input
Your result

Enter values and select Calculate.

Reproducible example

Work through the default case

The example uses these inputs. Replace them with your own values only after checking the model assumptions.

InputValueUnit
Damping ratio0.5dimensionless
Percentage overshoot
16.30335 %

These values show the equation in use. They are not recommended operating conditions or material specifications.

The formula and its symbols

For the standard underdamped second-order system with unit-step input, the peak percentage overshoot is

Mp = 100 exp[−πζ / √(1 − ζ²)]

The result comes from evaluating the step response at its first peak, tp = π/ωd. Course notes from the University of Illinois (ECE 486) derive it this way and describe the formula as exact. At ζ = 0 the response never decays, and at ζ ≥ 1 there is no overshoot, which is why the calculator accepts only 0.0001 to 0.9999.

Assumptions, and where the model breaks down

When the model does not fit, read the overshoot from a simulation or a measured step response instead.

Worked example

Overshoot, peak time and settling time for ζ = 0.5

With ζ = 0.5: √(1 − 0.25) = 0.8660, πζ/√(1 − ζ²) = 1.8138 and exp(−1.8138) = 0.1630. The overshoot is 16.3 %, which is the calculator's default.

Now take ωn = 10 rad/s. Then σ = 5 1/s and ωd = 8.660 rad/s, so the peak occurs at tp = π/ωd = 0.363 s. The Illinois notes estimate the 5 % settling time as 3/σ = 0.60 s. The King Fahd University (KFUPM) notes give the 2 % criterion as about four time constants, 4/σ = 0.80 s.

To find the damping ratio for a target overshoot, rearrange the formula. For 10 % overshoot, ζ = −ln(0.10) / √(π² + ln²(0.10)) = 2.3026 / 3.8950 = 0.591.

How to read the result

Overshoot falls quickly as damping rises:

ζOvershoot
0.252.7 %
0.516.3 %
0.74.6 %
0.90.15 %

Low damping gives a fast response with large overshoot. Higher damping removes the overshoot but slows the rise, so the choice of ζ is a trade between the two.

Common mistakes

Frequently asked questions

What is the percent overshoot formula?

Mp = 100 exp[−πζ/√(1 − ζ²)], where ζ is the damping ratio of a standard underdamped second-order system with 0 < ζ < 1.

What damping ratio gives 10 % overshoot?

About 0.59. Rearranging the formula gives ζ = −ln(Mp/100) / √(π² + ln²(Mp/100)).

Does natural frequency change the overshoot?

No. The formula contains only ζ. A higher ωn makes the same shape happen faster.

Is there overshoot when ζ is 1 or more?

Not in the standard second-order step response. Critically damped and overdamped responses approach the final value without crossing it.

Is a 2 % or 5 % band used for overshoot?

Neither. Those bands define settling time. Overshoot is the height of the first peak above the final value.

Related pages

Damping ratio and overshoot explained covers the pole picture behind this formula. The first-order rise-time calculator handles the simpler single-pole case.

Sources & further reading